What this is. A 2-page extract of a first draft, written to show the standard of work you would receive. It answers a real, closed tender: New Plymouth District Council, RFP 25/26-231 Aquatic Centre Non-Slip Flooring Replacement (GETS RFx ID 35294839, closed 19 November 2026, 12:00 pm NZDT).
The respondent is fictional ("Respondent Ltd"). Every fact about the respondent that we do not hold is marked [TO BE PROVIDED]. The extract is built only from the public GETS notice; the full RFx documents (evaluation criteria and weightings, returnable schedules, page limits) sit on TenderLink and were not used. In a paid order, the draft is built from the full documents and your notes on your client.
Response to RFP 25/26-231 – Aquatic Centre Non-Slip Flooring Replacement
1. Executive summary
NPDC needs the non-slip flooring in the indoor pool complex at the New Plymouth Aquatic Centre replaced with a Degadur non-slip flooring system, while the Centre stays open and safe for patrons and staff. Respondent Ltd proposes to deliver this through a staged programme agreed with Centre management, with each stage physically separated from public areas, so that the facility can keep operating throughout the works.
Our response is organised around the five objectives NPDC has set out for this project:
- a high-quality and durable Degadur non-slip flooring system;
- minimal disruption to Aquatic Centre operations and patrons;
- safe access and operations within an active public facility;
- completion within the agreed staging programme;
- a collaborative and professional working relationship with NPDC.
Respondent Ltd has [TO BE PROVIDED: number] years of experience installing resin-based flooring in [TO BE PROVIDED: aquatic / recreational / comparable public facilities], including [TO BE PROVIDED: 2–3 named projects, with client and year].
2. Relevant experience and track record
NPDC requires a contractor who can demonstrate expertise in specialist resin-based flooring in aquatic, recreational or comparable public facilities. The projects below are the closest match to this brief.
| Project | Relevance to NPDC | Referee |
|---|---|---|
| [TO BE PROVIDED: project 1 – facility, scope, m², year] | Wet-area resin flooring installed while the facility remained open [confirm] | [TO BE PROVIDED] |
| [TO BE PROVIDED: project 2] | Degadur or equivalent system [confirm system used] | [TO BE PROVIDED] |
| [TO BE PROVIDED: project 3] | Public facility, staged works, public safety management | [TO BE PROVIDED] |
Writer note: evaluators score evidence, not claims. If your client has no aquatic project, lead with the closest wet-area public project and say so plainly.
3. Methodology: quality and durability of the flooring system
Our methodology follows the system manufacturer's installation requirements for Degadur [TO BE PROVIDED: confirm the client is an approved/trained installer and attach evidence]. For each stage we will:
- Survey and test the substrate before removal, recording its condition and moisture readings [TO BE PROVIDED: test method and acceptance limits from the specification].
- Remove the existing flooring and prepare the substrate to the profile required by the system specification.
- Install the system in the layers and thicknesses specified, with the slip-resistance finish specified for wet barefoot areas [TO BE PROVIDED: slip-resistance rating required by the RFx].
- Cure, inspect and hand over each stage only after a joint inspection with NPDC, with hold points recorded in our quality plan.
Warranty: [TO BE PROVIDED: workmanship warranty period and manufacturer warranty, as offered].
4. Minimising disruption and keeping the facility safe
Because the Aquatic Centre remains in use, we treat patron and staff safety as part of the methodology, not an add-on:
- Staging agreed in advance with Centre management, so that pool areas close one at a time [TO BE PROVIDED: proposed stages and durations].
- Physical separation of each work zone, with signage and controlled access routes for patrons, staff and emergency egress.
- Noise, odour and ventilation controls during removal and resin application, with noisy or odour-producing tasks scheduled [TO BE PROVIDED: e.g. outside opening hours, if the client can do this].
- Health and safety managed under our site-specific safety plan in line with the Health and Safety at Work Act 2015 [TO BE PROVIDED: client's H&S accreditation, if any].
5. Programme and working relationship
We will deliver to the staging programme agreed with NPDC [TO BE PROVIDED: indicative programme from the RFx], with a weekly progress update to the NPDC project manager covering progress against programme, upcoming area closures and any risks. Our nominated contact for NPDC is [TO BE PROVIDED: name, role].
Writer note: once the RFx evaluation criteria and weightings are known, sections 2–5 are re-ordered and sized to match them, and each heading uses the criterion's own wording.